Boker Magnum Long Lead Pocket Knife - 3.14" Blade, Black G10 Handle - 01SC080
- Stock Status: In Stock
- Product Code: 01SC080
£29.99
Boker Magnum Long Lead Pocket Knife - 3.14" Blade, Black G10 Handle - 01SC080
Overall Length: 18,4 cm
Blade Length: 8 cm
Blade Thickness: 2,7 mm
Weight: 78 g
Blade Material: 8Cr13MoV
Handle Material: G10
Opener: Nail Nick
Opening: Manual
Lock Type: Slipjoint
Color: Black
Blade Color: Uncoated

Subject to age verificaiton if required
Delivery Options available at checkout
We accept Visa, Mastercard
ApplePay, GooglePay and PayPal
This is an age verified product.